front 1 The filter lens shade number to be used when light cutting up to 1 inch shall be ____________. | back 1 3 or 4 |
front 2 If an infringement of a copyright or patent is discovered by, or made
known to, the Contractor, the | back 2 Contractor |
front 3 A contractor is performing an estimate on a building with drawings
scaled to 3/8" = 1' 0". The contractor then | back 3 13' 0" |
front 4 The contractor’s final payment affidavit must be delivered to the
owner no later than ____________ days | back 4 5 |
front 5 Those liens to be paid last are the _______________. | back 5 Liens of the contractor |
front 6 It is important that slab formwork measuring 42’-0” x 74’-0” be
square before concrete is poured. The | back 6 85’ -1” |
front 7 The thickness of blown-in insulation shall be written in inches on
markers that are installed at least one for | back 7 300 |
front 8 Where equipment replacements and repairs must be performed in an
emergency situation, the permit | back 8 Submitted the next working business day after the replacement/repair has been completed |
front 9 A secondary qualifying agent has pulled a permit for a building
project. There is a problem with payment to | back 9 Primary qualifying agent |
front 10 The Workers’ Compensation Law Act requires the employers carry
insurance to cover employee’s | back 10 $500 |
front 11 Asbestos can only be removed by a ______________________. | back 11 Licensed Asbestos Contractor |
front 12 The Subcontractor shall make all Claims promptly to the Contractor
for additional cost, extensions of time | back 12 Two working days |
front 13 If a contractor receives a deposit of $20,000 on a contract requiring
a building permit with a total contract | back 13 30 |
front 14 A claim of lien is effective for ___________ from the date on which it is recorded. | back 14 1 year |
front 15 The Owner shall furnish to the Contractor, within __________ days
after receipt of written request, | back 15 15 |
front 16 Orders imposing disciplinary action for local disciplinary action
against a contractor shall contain all of the | back 16 An invoice for all fines and penalties |
front 17 Addenda will be issued no later than _________ days prior to the date for receipt of Bids. | back 17 4 |
front 18 The owner may terminate the period of effectiveness of a notice of
commencement by recording a notice of | back 18 30 |
front 19 A _____________ provides a monthly indication of the contract value,
cost expenses to date as well as a | back 19 Monthly indicated outcome report |
front 20 The contractor shall promptly provide notice to the owner and
architect before conditions are disturbed and | back 20 14 |
front 21 Billings for work performed or costs incurred by one party that, in
accordance with the agreement, should | back 21 Back charges |
front 22 The project construction schedule should be updated at least once every ___________ days. | back 22 30 |
front 23 The number of squares of roofing materials to be ordered for a roof
with dimensions 68’ x 62’ 6” and a | back 23 55.50 |
front 24 Prior to the settlement of an insured loss, Owner shall notify
Contractor the terms of the proposed | back 24 14 |
front 25 The ___________________ owns the float. | back 25 First to use |
front 26 The Contractor has achieved substantial completion on a $1,380,200
contract. Previously payments made | back 26 $254,880 |
front 27 The maximum fine to be imposed for obtaining a license through fraud or misrepresentation is _______. | back 27 $10,000 |
front 28 The issuance of a Certificate for Payment will constitute a
representation by the ____________ that the | back 28 Architect |
front 29 The slope of a parking lot that drops 8” in 90 is _______________. | back 29 .0074 |
front 30 The Notice of Commencement shall be the responsibility of
____________________to be recorded in the | back 30 The Owner |
front 31 A permit issued shall be come invalid if the work authorized by such
permit is suspended or abandoned for | back 31 6 months |
front 32 The grade of a parking lot that drops 8” in 90 is _______________%. | back 32 .74 |
front 33 Under the completed contract method, the contractor may recognize the profit ______________. | back 33 When the project is nearly complete |
front 34 If there is a 47 ft long 2 x 4 x 8 ft partition wall with the studs
spaced 16” on center and it has a double top | back 34 291.33 |
front 35 The subcontractor shall correct, repair or replace defective work
within __________ hours after receiving | back 35 24 |
front 36 A HP 14 x 89 weighs _______________ lbs. per square foot. | back 36 89 |
front 37 The _________________________ method for recording income is the most
preferred method for | back 37 Percentage of completion |
front 38 For a labor (manpower) estimate, there are various factors which
affect production and would include all of | back 38 Supervision available on site |
front 39 A room or space used for assembly purposes less than 750 square feet
in area and accessory to another | back 39 Group B |
front 40 _____________ means that goods first added to inventory are assumed
to be the first goods sold from | back 40 FIFO |
front 41 A good preliminary labor estimate should vary less than ____________ percent. | back 41 15 |
front 42 The CSI MasterFormat classification system has __________ technical divisions. | back 42 49 |
front 43 Claims by either the Owner or Contractor shall be initiated within
________ days after occurrence of the | back 43 21 |
front 44 The business organization must notify DBPR of the termination of the
qualifying agent and obtain another | back 44 60 |
front 45 The Contractor shall pay the Subcontractor each progress payment no
later than ___________ working days | back 45 7 |
front 46 After relocating his business to a new location, the Contractor has
________ days to notify the Board office | back 46 30 |
front 47 An order for a minor change in the Work may be issued by the _______________ alone. | back 47 Architect |
front 48 Laborers that are average trained, have fair morale and a normal
absence rate would have a production | back 48 55 to 85 |
front 49 If a restaurant has an approved occupancy for 1,000 people, the
minimum number of required accessible | back 49 20 |
front 50 The Architect will have control over or charge of all the following except for ______________. | back 50 Subcontractors |
front 51 In the event of the death of the qualifying agent, _____________ may
finish an existing project that is under | back 51 Any one |
front 52 Elevators shall be provided with Phase I emergency recall operation
and Phase II emergency in-car | back 52 ASME A17.1 |
front 53 _______________ insurance covers subcontractor materials on job
sites, while in transit or while stored at | back 53 Installation floater |
front 54 ________________ is NOT an advantage of Network Analysis | back 54 Determining the longest length of time that the project can be completed |
front 55 The Owner may ____________ terminate the Contract for the Owner’s convenience and without cause. | back 55 At any time |
front 56 Any person who commences any work before obtaining the necessary
permits shall be subject to | back 56 A fee established in addition to the required permit fees |
front 57 __________________ is a procedure under which progress billings are
accelerated in relation to costs | back 57 Front end loading |
front 58 Once the subcontractor is officially terminated, the contractor should ______________________. | back 58 Leave all the subcontractor’s equipment and materials on site until
subcontractor’s work is |
front 59 One of the three C’s of underwriting Bonds is NOT ____________. | back 59 Contract |
front 60 ______________________ shall be used in the absence of total agreement on the terms of a Change Order. | back 60 A construction change directive |
front 61 The original contract amount is $252,134.00. The sum of the previous
change orders was $12,125.00 and a | back 61 $266,393.00 |
front 62 The Bidder shall deliver the required bonds to the Owner not later
than ________ hours following the | back 62 72 |
front 63 The required amount of property damage insurance coverage a general
contractor will obtain and maintain | back 63 $50,000 |
front 64 The Architect may order minor changes in the Work that are consistent
with the intent of the Contract | back 64 Shall be in writing |
front 65 _________________ contracts normally contain a ceiling price. | back 65 Cost plus |