front 1 On sheet 2 of 15 of plan set #9501, the distance from gridline point D1 to gridline point D12 is _________ ft. | back 1 134 |
front 2 | back 2 187 |
front 3 __________cubic yards of concrete are required to pour all the foundation footings marked as #5 locations. Do not deduct for the volume of any steel reinforcing. Select the closest answer. | back 3 20 |
front 4 ___________18H5 bar joists are required for the project's main tower roof framing. | back 4 54 |
front 5 The distance from point B to point C on the plan is _________ ft. | back 5 301.04 |
front 6 The Owner wants to install sod on his property. The contractor will order _____________ square foot of sod for his property. Select the closest answer. | back 6 65,000 |
front 7 The total Labor and Material cost for a project was estimated to be $250,000 and 55% of that total was estimated for Materials. The additional profit on the job will be ____________if actual Labor costs were only 85% of the estimated Labor costs. | back 7 $16,875 |
front 8 Temporary structures shall have an exit access travel distance of ______ feet or less. | back 8 100 |
front 9 Ownership passes to the company at the point where the goods are FOB or ____________. | back 9 Free on board |
front 10 In the state of Florida, _____________requires a license. | back 10 A contractor repairing damaged storm shutters for $1500. |
front 11 The first offense by a person falsely presenting themselves as a licensed contractor is a ________. | back 11 First degree misdemeanor |
front 12 In a threshold building, the contractor's contractual or statutory obligations shall not be relieved _____. | back 12 By any action of the special inspector |
front 13 The burden of proof of the merit of any proposed substitution is upon the _________. | back 13 Proposer |
front 14 A(an) _______________warranty work in construction would be used for its intended purpose. | back 14 Implied |
front 15 If the Subcontractor fails within _______ days after receipt of written notice from the Contractor to correct defective Work, the Contractor may make good such deficiencies. | back 15 Five working |
front 16 The Architect will _________ after receipt of a Contractor's Application for Payment, either issue to the Owner a Certificate for Payment or notify the Contractor and Owner in writing of the Architect's reasons for withholding certification. | back 16 Within seven days |
front 17 According to the Davis-Bacon Act, the ______ may withhold contract payments to cover alleged under-payments of wages. | back 17 Secretary of Labor |
front 18 If you are not in direct privity of contract with the owner, the Construction Lien Law requires that you _______________. | back 18 Serve a notice to owner |
front 19 If a #2 framing lumber is selling for $6.50 per board-foot, the cost of 820 lineal feet of 2x4, 686 lineal feet of 2x6 and 243 lineal feet of 2x8 would be ________________. Select the closest answer. | back 19 $10,120 |
front 20 Building inspections shall include ___________________. | back 20 Foundation, Framing, Sheathing, Roofing and Final inspections |
front 21 Temporary sanitary facilities and drinking water are typically covered by the ________ of a contract. | back 21 Supplementary General Conditions |
front 22 ________________ limit is NOT one the limits of liability under a Commercial General Liability insurance policy. | back 22 Property damage during construction |
front 23 A Contractor submitted an application for a progress payment. The
project has a $246,000 contract amount and was 66% complete at the
time of the payment application. The Architect did not certify $22,000
of the requested amount. The retainage rate is 10%. The Contractor
should expect to receive _____________. | back 23 $126,325 |
front 24 Change Orders with back charges to the Contractor when the Owner corrects defective work shall include _____ costs of correcting such deficiencies. | back 24 Reasonable |
front 25 A permanent sign identifying the termite treatment provider and need for reinspection and treatment contract renewal shall be provided and posted near the _______. | back 25 Water heater or electrical panel |
front 26 Because inventory is consumed over a relatively short period of time, usually not exceeding one year, it is regarded as a __________ of a company. | back 26 Current asset |
front 27 ____________is an example of work that does NOT require a building permit. | back 27 Installing portable ventilation equipment |
front 28 Addenda are modifications to or interpretations of the Bidding Documents and will be issued ______. | back 28 No later than four days prior to the date for receipt of Bids |
front 29 Construction materials and equipment shall not be placed or stored within ___________ feet of a street intersection. | back 29 20 |
front 30 In general, a contract ________ should be recognized as complete under the completed contract method. | back 30 In excess of 98% or 99% completed |
front 31 All employers with _______ employee(s) must maintain an OSHA 300/300A log. | back 31 Eleven |
front 32 In network construction, _______________are those which are based upon physical characteristics of the work and is normally inflexible. | back 32 Hard dependencies |
front 33 It is estimated that the Contractor will need to purchase 250 2 x 4’s
that are only available in 10 ft lengths. | back 33 $11,600 |
front 34 Among the State requirements for educational facilities is the requirement that new buildings, additions, renovations and remodeling shall not be occupied until the building has received a (n) _______. | back 34 Certificate of occupancy |
front 35 The Contractor shall NOT be responsible for __________________. | back 35 Scheduling safety compliance inspections |
front 36 __________________________ are NOT items that are included in the general conditions of a contract. | back 36 Jobsite offices |
front 37 A Subcontractor may terminate a Subcontract for nonpayment of amounts due for______ days or longer. | back 37 60 |
front 38 Alterations made to provide an accessible path of travel to the altered area will be deemed disproportionate to the overall alteration when the cost exceeds ______________ percent. | back 38 20 |
front 39 An accurate estimating method that lists all materials and labor needed for an element of work or project is called _________________ method. | back 39 Detailed survey or piece |
front 40 Under the legal principal of _____________, a contractor may be entitled to a reasonable value of the work requested and performed even without reaching an agreement. | back 40 Quantum meriut |
front 41 Under FL Lien Law, a person who knowingly uses funds paid on account of a $950 project without paying subs, suppliers and/or laborers is guilty of misapplication of construction funds has committed a _________. | back 41 Felony of the third degree |
front 42 Walkways for pedestrians in front of demolition projects during the renovation of an existing building shall be of sufficient width to accommodate pedestrian traffic but in no case shall ______. | back 42 Not be less than 4 feet in width |
front 43 The ___________________ method is the simplest method of accounting control of inventory. | back 43 Average cost |
front 44 A __________________ clause is typically found in subcontract
agreements between the contractor and | back 44 Flow down |
front 45 The date for receipt of bids for a project is Friday, Oct 9. The last date on which Addenda modifying the bid documents may be issued is _______________. | back 45 Thirty |
front 46 The date for receipt of bids for a project is Friday, Oct 9. The last date on which Addenda modifying the bid documents may be issued is _______________. | back 46 Sunday, Oct 4 |
front 47 The fee owner of a threshold building shall select and pay all the costs of employing a special inspector, but the special inspector shall be responsible to _______. | back 47 The enforcement agency |
front 48 The ___________owns the drawings for a completed project. | back 48 The Architect |
front 49 A concrete slab 140'-8" long, 75'-10" wide and 9-1 /2" thick will require __________cubic yards of concrete. Select the closest answer. | back 49 Between 300 and 325 |
front 50 An application for a permit for any proposed work shall be deemed to have been abandoned ___________ days after date of filing. | back 50 180 |
front 51 A ___________________ bond exempts the owner’s real property from claims of lien. | back 51 Payment |
front 52 The Subcontractor shall furnish the Contractor periodic progress
reports ________ on the Work of this | back 52 As mutually agreed |
front 53 In cases of Claims for additional time due to a continuing delay, ______. | back 53 Only one Claim is necessary to be filed |
front 54 Construction lien law is NOT applicable to ______. | back 54 Public property |
front 55 General Contractor license holders are NOT required to subcontract _______________. | back 55 The installation of wood shingles, wood shakes, or asphalt or fiberglass shingle roofing on new buildings of their own construction |
front 56 The construction manager contracts and acts as agent for the owner in a ______________ contract. | back 56 Construction management contract |
front 57 The maximum fine to be imposed on a contractor for working with a
delinquent license and it is a second | back 57 5,000 |
front 58 Trusses on a new, single-family detached residential project, shall be inspected ______. | back 58 By the building official during the framing inspection |
front 59 Allowances do NOT include ______________________. | back 59 Applicable trade discounts |
front 60 Any required certificates of inspection shall be secured by the ______. | back 60 Contractor |
front 61 The cost to backfill and compact a 15 ft x 25 ft x 5 ft deep excavation with vertical sides if the excavation contractor charges $1.75 per square foot for each 6-inch lift is________________. Select the closest answer. | back 61 $6,565 |
front 62 An approved water supply for fire protection shall be made available _______. | back 62 As soon as combustible material arrives on the site |
front 63 Requests for clarification or interpretation of the Bidding Documents
shall reach the Architect at least | back 63 Seven |
front 64 An employee who feels they have been discriminated against because they reported a suspected OSHA violation may file a complaint with the nearest OSHA office within ______ days of this alleged discrimination. | back 64 30 |
front 65 In the contract provisions, insurance to be maintained by contractor will be specified in the ____________. | back 65 Proposal |