front 1 Lean and six sigma share in common which of the following traits?
| back 1 b |
front 2 The most important element in LSS deployment would be considered:
| back 2 c |
front 3 Which of the following concepts is mostly associated with Taiichi Ohno?
| back 3 d |
front 4 Which of the following is the most acceptable reason for the deployment of LSS projects?
| back 4 a |
front 5 LSS project benefits would include which of the following?
| back 5 b |
front 6 Kaplan and Norton have outlined a business planning process that gives consideration to factors other than strictly financial ones. It provides a greater perspective for stakeholder interests. This approach is referred to as:
| back 6 a |
front 7 Increasing performance in a LSS corporation from 3 sigma to 4 sigma would reduce defects per million by a factor of:
| back 7 c |
front 8 In a nutshell, LSS is considered:
| back 8 a |
front 9 What guru is MOST widely associated with DOE?
| back 9 d |
front 10 The term "metrics" most frequently refers to:
| back 10 d |
front 11 If one chose to look at any business enterprise on a main level basis, which of the following category choices would have either KPIV (key process input variables) or KPOV (key process output variables)?
| back 11 a |
front 12 What luminary is generally recognized as being the creator of the control chart?
| back 12 b |
front 13 The defect levels, as reported by Motorola in their six sigma program, are higher than one might expect from use of a standard normal table or traditional capability calculations. Why is this true?
| back 13 c |
front 14 A lean enterprise approach encompasses which of the following departments?
| back 14 b |
front 15 From an upper management perspective, what has been the principle motivating factor in embracing LSS?
| back 15 a |
front 16 Strategic goals will be subdivided into:
| back 16 c |
front 17 Of the key elements of an organizational plan, which of the following would be most likely to contain numbers and dates?
| back 17 b |
front 18 Who was the first CEO to understand the need to control variation instead of the process average as a way to significantly improve quality?
| back 18 b |
front 19 Which of the following would be considered a strategic quality goal?
| back 19 a |
front 20 The concept most closely associated with lean production is:
| back 20 d |
front 21 Why is LSS called TQM on steroids?
| back 21 b |
front 22 Strategic goals must be subdivided. Thus, they are:
| back 22 d |
front 23 Many tools can be used in either lean or six sigma projects. A problem solving approach that unifies project follow-up is:
| back 23 c |
front 24 Which of the following quality gurus is most closely associated with the term "total quality management"?
| back 24 b |
front 25 The difference between strategic goals and the strategic business plan is that:
| back 25 a |
front 26 What would occur if the quality goals were not a part of the strategic plan?
| back 26 b |
front 27 Which American figure is seen as the earliest advocate of waste reduction?
| back 27 a |
front 28 A company has just started a LSS initiative. Which set of tools would be better suited for initial projects?
| back 28 a |
front 29 Which of the following quality luminaries would be most clearly identified as a proponent of improvement and breakthrough projects?
| back 29 c |
front 30 Strategic plan implementation at the functional level requires:
| back 30 c |
front 31 Which of the following legendary lean thinkers was never officially on Toyota's payroll?
| back 31 c |
front 32 Which of the following is a resource requirement needed to achieve strategic goals?
| back 32 a |
front 33 Who created the initial problem solving framework that would later become DMAIC?
| back 33 a |
front 34 After the development of a viable corporate strategy, the next logical step would be:
| back 34 b |
front 35 If a metrics format were being developed to track marketplace response, which of the following items would be included?
| back 35 b |
front 36 Metrics of the effectiveness of the strategic quality plan include:
| back 36 b |
front 37 The extension from lean production to lean office is possible because:
| back 37 b |
front 38 If metrics were used to track marketplace response as part of the strategic plan deployment, which of the following measures are most likely to be included?
| back 38 c |
front 39 Who should be the ultimate recipient of LSS project results?
| back 39 c |
front 40 One of Dr. Deming's 14 points for management states, "cease dependence upon inspection as a way to achieve quality". The underlying tenet of this statement is which of the following?
| back 40 b |