front 1 An expansionist capacity strategy is NOT indicated when
| back 1 b |
front 2 In general, a less capital-intensive industry such as a hotel chain would do well with a utilization rate of
| back 2 b |
front 3 Waiting-line models often are used in capacity planning in order to
| back 3 c |
front 4 Long-term capacity planning deals with which of the following factors?
| back 4 a |
front 5 Waiting-line problems that cannot be studied with waiting-line models must be analyzed with which analytical tool?
| back 5 a |
front 6 Input measures of capacity are preferred when there
| back 6 a |
front 7 When evaluating alternative capacity decisions, qualitative concerns exclude
| back 7 b |
front 8 Which tool deals more formally with demand uncertainty and variability of capacity decisions?
| back 8 d |
front 9 Anna's landscaping business has a capacity gap; which alternative can best be described as "simply to do nothing"?
| back 9 d |
front 10 Using input measures of capacity is least appropriate in which of the following situations?
| back 10 d |
front 11 Capacity planning requires demand forecasts for an extended period of time. Forecast accuracy tends to _______ as the forecasting horizon _______.
| back 11 d |
front 12 A diseconomy of scale is realized when
| back 12 d |
front 13 Which of the following is a principal reason that explains why economies of scale can drive costs down when output increases?
| back 13 d |
front 14 Chang and Chang observe that the competition is increasing the size of its warehouses. They have decided to do the same. They are following _______ strategy.
| back 14 a |
front 15 A measure of the reserve capacity a process has to handle in unexpected increases in demand is the
| back 15 c |