front 1 The foundation footer marked with the following symbol appears
____________ times on the foundation | back 1 14 |
front 2 The installed height of the acoustical ceiling on the First Floor is ________ ft. | back 2 11 |
front 3 The interior walls and floor of the Elevator Pit are to be coated
with a waterproofing compound. Each | back 3 9 |
front 4 The plans call for a total of ___________ stair treads from the 2nd floor to the 4th floor. | back 4 88 |
front 5 The diagonal distance from point A to point C is ________________. | back 5 76’ 4” |
front 6 A landscape contractor has been hired to supply and install sod for
this lot at the | back 6 More than $11,000 |
front 7 A contractor is hired to dig an excavation in dry clay. Assume the
percentage of swell is 35%. The bottom | back 7 42,000 to 44,999 |
front 8 ________________requires a permit. | back 8 A self -contained refrigeration system containing 15 pounds of
refrigerant and actuated by a 2 HP |
front 9 The percentage of completion method will result in revenue
recognition ______________ the completed | back 9 more quickly than |
front 10 A Change Order is prepatred by ________________. | back 10 The Architect |
front 11 If an Owner breaches a Contract, or a COntractor breaches a Subcontract, by nonpayment of a non-material amount, ________________. | back 11 There is no basis to terninate the Contract. |
front 12 __________________ contracts are normally negotiated between the owner and the contractor. | back 12 Cost-plus |
front 13 According to the AIA documents, "Contract Time" is the
period of time allotted in the Contract | back 13 For Substantial Completion of the Work |
front 14 A contractor is hired to apply three (3) coats of a waterproofing
coating to the walls and floor of an | back 14 $3,001 to $3,600 |
front 15 A ____________ contract provides that a contractor will perform
specific work and be paid per unit of | back 15 Unit-price contract |
front 16 The Contractor shall apply for progress payments ____________. | back 16 At least ten days before the date established for each progress payment |
front 17 The __________________ completes the Job Status Report for each project each month. | back 17 Field Superintendent |
front 18 A permit is required for a temporary structure that is used for the
gathering of ____________ or more | back 18 10 |
front 19 The ___________ bond guarantees that a contractor, if awarded a bid,
will enter into the contract at the | back 19 Bid |
front 20 The timing and sequence required for electrical inspections shall be _____________. | back 20 Underground, rough-in, final |
front 21 The FCRA Act applies to any employer which employs ________ or more
employees for each working | back 21 15 |
front 22 If framing lumber sells for $3.00/board foot, the cost of lumber
required to build a 2 x 4 stud wall, 16” on | back 22 $400.00 |
front 23 A Contractor submitted an application for a progress payment. The
project has a $146,000 contract amount | back 23 $42,902 |
front 24 The total Labor and Material cost for a project was estimated to be
$377,000 and 55% was estimated for | back 24 $25,447.50 |
front 25 The issuance of a Certificate for Payment by the Architect to the
Owner constitutes a representation by the | back 25 The Work has progressed to the point indicated and is in accordance with the Contract Documents. |
front 26 __________________ does NOT require a construction contracting license. | back 26 A local government employee |
front 27 __________________ does NOT require a building permit. | back 27 Installing a portable cooling unit |
front 28 An addendum will be issued _________________. | back 28 No later than 4 days prior to the date for receipt of bids |
front 29 Reinforcing bars are designated by number. The number represents the
approximate diameter of the bar in | back 29 1/8 |
front 30 Of the following terms, "offer, acceptance, description and
consideration,” __________ is NOT a term | back 30 Description |
front 31 A pedestrian walkway by a construction site shall have railings not
less than ________ and be sufficient to | back 31 42 inches in height |
front 32 Unless otherwise provided, performance and payment bonds shall be written on ______________. | back 32 AIA A312 |
front 33 If an Owner occupies a portion of the project prior to completion,
which of the following statements is | back 33 Unless otherwise agreed upon, partial occupancy or use of a portion
of the Work shall not constitute |
front 34 A contractor’s license number does NOT have to appear ___________________. | back 34 On free phone directory listings |
front 35 The bidder shall deliver the required bonds to the Owner _____________. | back 35 Not later than three days following the date of execution of the Contract |
front 36 The U Factor for glazed block shall be ___________. | back 36 .60 |
front 37 Upon such assignment, if the Work has been suspended for more than
_____________ days, the | back 37 30 |
front 38 If the amounts of payments misapplied has an aggregate value of
$7,500, the violator is guilty of | back 38 Felony of second degree |
front 39 A ____________contract benefits both the owner and contractor from
value engineering that may be | back 39 GMP (Guaranteed Maximum Price) |
front 40 An applicant may become a certified construction contractor if he has
at least _______ years’ experience as | back 40 4 |
front 41 The _________ establishes the amount of liquidated damages that would
result from a delay in completing | back 41 Owner |
front 42 The Subcontractor shall notify the Contractor within ___________ days
of an injury to an employee or | back 42 3 |
front 43 Each agreement for repair, restoration, improvement, or construction
to residential real property must | back 43 $2,500 |
front 44 If an owner of an owner-occupied residential building obtains a
permit to remove asbestos-containing | back 44 None of the above. Under no circumstances is an owner of a
residential building allowed to act as |
front 45 _________________owns the drawings, specifications and other
instruments of service after the | back 45 Architect |
front 46 ___________approves shop drawings from the structural steel fabricator. | back 46 Architect |
front 47 The Contractor shall permit the Subcontractor _____________
information regarding the percentages of | back 47 To request directly from the Architect |
front 48 A “Parking by Disabled Permit Only” sign shall be placed on or at
least _____________ feet above the | back 48 5 |
front 49 ___________ requires a permit. | back 49 Tents and other temporary structures larger than 120 square feet |
front 50 Which of the following statements is NOT true regarding a building permit? | back 50 Work covered by the permit shall commence within 180 days after the permit issue date. |
front 51 The penalty for a 1st violation of contracting without first
obtaining a license in the State of Florida is a | back 51 First degree misdemeanor |
front 52 If a contractor incurs liquidated damages as a result of a default by
a subcontractor, the contractor | back 52 Will not be able to recover the cost of the liquidated damages from
the subcontractor unless there is |
front 53 In cases of Claims for additional time due to a continuing delay, __________________. | back 53 Only one Claim is necessary. |
front 54 Repairs to an existing building located seaward of a coastal construction control line _______________. | back 54 Shall be designed to resist the predicted forces of a 100-year storm
surge, storm waves or other |
front 55 Carpet or carpet tile pile height shall be ________ inch maximum. | back 55 1/2 |
front 56 The ____________conducts the safety meetings and prepares the minutes. | back 56 Project Superintendent |
front 57 If the lienor fails to file a lawsuit to enforce the lien within ____
days of the date the clerk of court certifies | back 57 60 |
front 58 Trusses are inspected ______________. | back 58 By the building official during the framing inspection |
front 59 A Subcontractor shall furnish to the Contractor periodic progress
reports on the Work of the Subcontract | back 59 At mutually agreed upon intervals |
front 60 Construction materials and equipment shall not be placed or stored
within ____________ feet of a street | back 60 20 |
front 61 A contractor places the following order for several types of
structural steel. | back 61 $23,200 |
front 62 When a lien amount is less than _________________, it may be enforced
or foreclosed in the county | back 62 $15,000 |
front 63 Unless otherwise provided in the Contract Documents, _____ shall secure and pay for the building permit. | back 63 The Contractor |
front 64 The difference in the minimum penalty fines between a first offense
and a repeat offense for contracting | back 64 $1,000 |
front 65 A ramp has a rise of 7 1⁄2” over a distance of 200 feet, the slope or grade will be ______________. | back 65 .003 or .3% |