b

After the successful completion and implementation of the first four phases of DMAIC, the control phase should be completed by which of the following?

  1. The black belt alone; the project has been successfully completed
  2. The process owner alone; it is his/her responsibility to take the project from here
  3. The process owner and black belt together
  4. The complete team is the most desirable option
Front

Process A consists of several machines that combine their output into a common stream. Once combined, it is impossible to trace single pieces to specific machines. Process B receives the mixed pieces. A corrective action requires finding the root cause of a defect found in some of these pieces. A team assigned to this problem is thinking of using SQC to detect the source of the problem. Where should SQC be implemented?

  1. At the beginning of Process B
  2. At each machine in Process A
  3. At the end of Process B
  4. At the beginning of Process A
Front

Which of the following would be a device associated with the visual factory?

  1. Standard work
  2. Andon board
  3. Queue time
  4. Work cell
Front
1 / 13
Display first:
How to Navigate Cards

Go to card:

/ 344
Go
Next card: click ">" button
Previous card: click "<" button
Mark/Un-Mark card: click checkmark
Larger image: click magnify icon
Flip card: click card
Edit card: click "Edit" link
Start over: In "Options" menu
Shuffle: In "Options" menu
Next card: swipe left
Previous card: swipe right
Mark/Un-Mark card: tap checkmark
Larger image: tap magnify icon
Flip card: tap card
Edit card: tap "Edit" link
Start over: In "Options" menu
Shuffle: In "Options" menu
Next card: right arrow
Previous card: left arrow
Mark/Un-Mark card: SPACEBAR
Larger image: ENTER
Flip card: up/down arrow
Edit card: E
Start over: S
Shuffle: F
card-image

loading